US Bridges

Center ST over Sand Creek

Fair

Grayson County, Texas · 0.35 MI W of US 75 · Structure no. 010920C00560001

Built
1960
65 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
84 ft
2 main spans
Daily traffic
5,203
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Center ST over Sand Creek is a steel continuous stringer/multi-beam or girder carrying Center ST over Sand Creek in Grayson County, Texas. It was built in 1960, so it is 65 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,203 vehicles a day, projected to reach 1,085 by 2030. The structure is 84 ft (25.6 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCenter ST
CrossesSand Creek
Location0.35 MI W of US 75
RouteCity Street 0
StateTexas
Coordinates33.62733, -96.61922
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length84 ft (25.6 m)
Longest span40 ft (12.2 m)
Deck width36 ft (10.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,203 (2023)
Projected traffic1,085 by 2030
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Center ST over Sand Creek built?

It was built in 1960, making it 65 years old in 2025.

What condition is Center ST over Sand Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Center ST over Sand Creek carry?

About 5,203 vehicles per day (2023 count).

How long is Center ST over Sand Creek?

The structure is 84 ft (25.6 m) long with a longest span of 40 ft (12.2 m) and a deck 36 ft wide.

Who owns Center ST over Sand Creek?

It is owned by the City or Municipal Highway Agency.