US 377 over S Fork Big Mineral Creek
FairGrayson County, Texas · 0.8 MI N of US 82 · Structure no. 010920008110067
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected April 2023
- Type
- Slab
- Concrete
- Length
- 77 ft
- 3 main spans
- Daily traffic
- 8,529
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
US 377 over S Fork Big Mineral Creek is a concrete slab carrying US 377 over S Fork Big Mineral Creek in Grayson County, Texas. It was built in 1962, so it is 63 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,529 vehicles a day, roughly 16% of them trucks, projected to reach 10,840 by 2033. The structure is 77 ft (23.5 m) long and 44 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 377 over S Fork Big Mineral Creek built?
It was built in 1962, making it 63 years old in 2025.
What condition is US 377 over S Fork Big Mineral Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does US 377 over S Fork Big Mineral Creek carry?
About 8,529 vehicles per day (2020 count), of which roughly 16% are trucks.
How long is US 377 over S Fork Big Mineral Creek?
The structure is 77 ft (23.5 m) long with a longest span of 26 ft (7.9 m) and a deck 44 ft wide.
Who owns US 377 over S Fork Big Mineral Creek?
It is owned by the State Highway Agency.