US 75 Turnaround over US 75
GoodGrayson County, Texas · JCT US 75 and FM 120 · Structure no. 010920004718673
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 275 ft
- 2 main spans
- Daily traffic
- 1,000
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
US 75 Turnaround over US 75 is a prestressed concrete stringer/multi-beam or girder carrying US 75 Turnaround over US 75 in Grayson County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,000 vehicles a day, roughly 1% of them trucks, projected to reach 2,000 by 2046. The structure is 275 ft (83.8 m) long and 28 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 75 Turnaround over US 75 built?
It was built in 2018, making it 7 years old in 2025.
What condition is US 75 Turnaround over US 75 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does US 75 Turnaround over US 75 carry?
About 1,000 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is US 75 Turnaround over US 75?
The structure is 275 ft (83.8 m) long with a longest span of 96 ft (29.3 m) and a deck 28 ft wide.
Who owns US 75 Turnaround over US 75?
It is owned by the State Highway Agency.