US Bridges

US 75 Turnaround over US 75

Good

Grayson County, Texas · JCT US 75 and FM 120 · Structure no. 010920004718673

Built
2018
7 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
275 ft
2 main spans
Daily traffic
1,000
2018 count
Owner
State
State Highway Agency

About this bridge

US 75 Turnaround over US 75 is a prestressed concrete stringer/multi-beam or girder carrying US 75 Turnaround over US 75 in Grayson County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 1% of them trucks, projected to reach 2,000 by 2046. The structure is 275 ft (83.8 m) long and 28 ft wide.

CarriesUS 75 Turnaround
CrossesUS 75
LocationJCT US 75 and FM 120
RouteU.S. Route 75
StateTexas
Coordinates33.76204, -96.58534
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2 (+2 approach)
Design loadHL 93
Structure length275 ft (83.8 m)
Longest span96 ft (29.3 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2018)
Projected traffic2,000 by 2046
Trucks1%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 75 Turnaround over US 75 built?

It was built in 2018, making it 7 years old in 2025.

What condition is US 75 Turnaround over US 75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does US 75 Turnaround over US 75 carry?

About 1,000 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is US 75 Turnaround over US 75?

The structure is 275 ft (83.8 m) long with a longest span of 96 ft (29.3 m) and a deck 28 ft wide.

Who owns US 75 Turnaround over US 75?

It is owned by the State Highway Agency.