US 75 over Draw
FairGrayson County, Texas · 0.8 MI S of FM 121 · Structure no. 010920004713182
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected March 2023
- Type
- Culvert
- Concrete
- Length
- 28 ft
- 2 main spans
- Daily traffic
- 41,907
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
US 75 over Draw is a concrete culvert carrying US 75 over Draw in Grayson County, Texas. It was built in 1965, so it is 60 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 41,907 vehicles a day, roughly 14% of them trucks, projected to reach 52,550 by 2033. The structure is 28 ft (8.5 m) long.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 75 over Draw built?
It was built in 1965, making it 60 years old in 2025.
What condition is US 75 over Draw in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does US 75 over Draw carry?
About 41,907 vehicles per day (2020 count), of which roughly 14% are trucks.
How long is US 75 over Draw?
The structure is 28 ft (8.5 m) long with a longest span of 9 ft (2.7 m).
Who owns US 75 over Draw?
It is owned by the State Highway Agency.