US 75 over W Farmington/Blythe RD
FairGrayson County, Texas · 4.6 MI S of FM 902 · Structure no. 010920004713176
- Built
- 1965
- 60 years old, rebuilt 2003
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 150 ft
- 1 main span
- Daily traffic
- 40,131
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
US 75 over W Farmington/Blythe RD is a steel continuous stringer/multi-beam or girder carrying US 75 over W Farmington/Blythe RD in Grayson County, Texas. It was built in 1965 and reconstructed in 2003, so it is 60 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 40,131 vehicles a day, roughly 15% of them trucks, projected to reach 49,960 by 2033. The structure is 150 ft (45.7 m) long and 112 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 75 over W Farmington/Blythe RD built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 2003.
What condition is US 75 over W Farmington/Blythe RD in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does US 75 over W Farmington/Blythe RD carry?
About 40,131 vehicles per day (2018 count), of which roughly 15% are trucks.
How long is US 75 over W Farmington/Blythe RD?
The structure is 150 ft (45.7 m) long with a longest span of 60 ft (18.3 m) and a deck 112 ft wide.
Who owns US 75 over W Farmington/Blythe RD?
It is owned by the State Highway Agency.