US Bridges

US 69 NB over BNSF & UPRR

Good

Grayson County, Texas · 0.8 MI N of SP 503 · Structure no. 010920004702627

Built
2013
12 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,610 ft
12 main spans
Daily traffic
6,643
2020 count
Owner
State
State Highway Agency

About this bridge

US 69 NB over BNSF & UPRR is a prestressed concrete stringer/multi-beam or girder carrying US 69 NB over BNSF & UPRR in Grayson County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,643 vehicles a day, roughly 24% of them trucks, projected to reach 7,520 by 2033. The structure is 1,610 ft (490.7 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 69 NB
CrossesBNSF & UPRR
Location0.8 MI N of SP 503
RouteU.S. Route 69
StateTexas
Coordinates33.75024, -96.53707
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans12 (+7 approach)
Design loadHL 93
Structure length1,610 ft (490.7 m)
Longest span112 ft (34.1 m)
Deck width38 ft (11.6 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,643 (2020)
Projected traffic7,520 by 2033
Trucks24%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 69 NB over BNSF & UPRR built?

It was built in 2013, making it 12 years old in 2025.

What condition is US 69 NB over BNSF & UPRR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does US 69 NB over BNSF & UPRR carry?

About 6,643 vehicles per day (2020 count), of which roughly 24% are trucks.

How long is US 69 NB over BNSF & UPRR?

The structure is 1,610 ft (490.7 m) long with a longest span of 112 ft (34.1 m) and a deck 38 ft wide.

Who owns US 69 NB over BNSF & UPRR?

It is owned by the State Highway Agency.