US Bridges

US 82 EB over SP RR & Frisco RD

Fair

Grayson County, Texas · 0.3 MI E of SH 91 · Structure no. 010920004519148

Built
1975
50 years old
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
290 ft
3 main spans
Daily traffic
7,809
2020 count
Owner
State
State Highway Agency

About this bridge

US 82 EB over SP RR & Frisco RD is a prestressed concrete stringer/multi-beam or girder carrying US 82 EB over SP RR & Frisco RD in Grayson County, Texas. It was built in 1975, so it is 50 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,809 vehicles a day, roughly 2% of them trucks, projected to reach 9,200 by 2033. The structure is 290 ft (88.4 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 82 EB
CrossesSP RR & Frisco RD
Location0.3 MI E of SH 91
RouteU.S. Route 82
StateTexas
Coordinates33.66628, -96.59104
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3 (+2 approach)
Design loadHS 20
Structure length290 ft (88.4 m)
Longest span70 ft (21.3 m)
Deck width50 ft (15.3 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,809 (2020)
Projected traffic9,200 by 2033
Trucks2%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 82 EB over SP RR & Frisco RD built?

It was built in 1975, making it 50 years old in 2025.

What condition is US 82 EB over SP RR & Frisco RD in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does US 82 EB over SP RR & Frisco RD carry?

About 7,809 vehicles per day (2020 count), of which roughly 2% are trucks.

How long is US 82 EB over SP RR & Frisco RD?

The structure is 290 ft (88.4 m) long with a longest span of 70 ft (21.3 m) and a deck 50 ft wide.

Who owns US 82 EB over SP RR & Frisco RD?

It is owned by the State Highway Agency.