US Bridges

FM 2375 over North Fork Red River

Fair

Gray County, Texas · 0.1 MI W of SH 273 · Structure no. 040910186101010

Built
1985
40 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
600 ft
8 main spans
Daily traffic
164
2023 count
Owner
State
State Highway Agency

About this bridge

FM 2375 over North Fork Red River is a prestressed concrete stringer/multi-beam or girder carrying FM 2375 over North Fork Red River in Gray County, Texas. It was built in 1985, so it is 40 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 164 vehicles a day, roughly 41% of them trucks, projected to reach 190 by 2033. The structure is 600 ft (182.9 m) long and 36 ft wide. If it were closed, the detour would be 11.8 mi (19 km).

CarriesFM 2375
CrossesNorth Fork Red River
Location0.1 MI W of SH 273
RouteState Highway 2375
StateTexas
Coordinates35.43472, -100.81339
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans8
Design loadHS 20
Structure length600 ft (182.9 m)
Longest span75 ft (22.9 m)
Deck width36 ft (11.1 m)
Roadway width34 ft (10.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic164 (2023)
Projected traffic190 by 2033
Trucks41%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.8 mi (19 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2375 over North Fork Red River built?

It was built in 1985, making it 40 years old in 2025.

What condition is FM 2375 over North Fork Red River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does FM 2375 over North Fork Red River carry?

About 164 vehicles per day (2023 count), of which roughly 41% are trucks.

How long is FM 2375 over North Fork Red River?

The structure is 600 ft (182.9 m) long with a longest span of 75 ft (22.9 m) and a deck 36 ft wide.

Who owns FM 2375 over North Fork Red River?

It is owned by the State Highway Agency.