US Bridges

FM 291 over Draw

Good

Gray County, Texas · 1.8 MI N of IH 40 · Structure no. 040910079501003

Built
1949
76 years old, rebuilt 1962
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
33 ft
5 main spans
Daily traffic
105
2023 count
Owner
State
State Highway Agency

About this bridge

FM 291 over Draw is a concrete culvert carrying FM 291 over Draw in Gray County, Texas. It was built in 1949 and reconstructed in 1962, so it is 76 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 105 vehicles a day, roughly 20% of them trucks, projected to reach 70 by 2033. The structure is 33 ft (10.1 m) long. If it were closed, the detour would be 11.2 mi (18 km).

CarriesFM 291
CrossesDraw
Location1.8 MI N of IH 40
RouteState Highway 291
StateTexas
Coordinates35.23729, -100.74464
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans5
Design loadH 15
Structure length33 ft (10.1 m)
Longest span6 ft (1.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic105 (2023)
Projected traffic70 by 2033
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$75,000
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 291 over Draw built?

It was built in 1949, making it 76 years old in 2025. It was reconstructed in 1962.

What condition is FM 291 over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does FM 291 over Draw carry?

About 105 vehicles per day (2023 count), of which roughly 20% are trucks.

How long is FM 291 over Draw?

The structure is 33 ft (10.1 m) long with a longest span of 6 ft (1.8 m).

Who owns FM 291 over Draw?

It is owned by the State Highway Agency.