FM 2441 over Salt Creek
GoodGoliad County, Texas · 12.9 MI S of US 183 · Structure no. 160890288501003
- Built
- 1975
- 50 years old
- Condition
- Good
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 135 ft
- 3 main spans
- Daily traffic
- 137
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
FM 2441 over Salt Creek is a prestressed concrete box beam or girders - multiple carrying FM 2441 over Salt Creek in Goliad County, Texas. It was built in 1975, so it is 50 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 137 vehicles a day, roughly 1% of them trucks, projected to reach 270 by 2033. The structure is 135 ft (41.1 m) long and 28 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 2441 over Salt Creek built?
It was built in 1975, making it 50 years old in 2025.
What condition is FM 2441 over Salt Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does FM 2441 over Salt Creek carry?
About 137 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is FM 2441 over Salt Creek?
The structure is 135 ft (41.1 m) long with a longest span of 45 ft (13.7 m) and a deck 28 ft wide.
Who owns FM 2441 over Salt Creek?
It is owned by the State Highway Agency.