US Bridges

Pine RD over Drainage Ditch

Good

Galveston County, Texas · 0.30 MI S of FM 1764 · Structure no. 120850C00138050

Built
2019
6 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
75 ft
3 main spans
Daily traffic
800
2014 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Pine RD over Drainage Ditch is a prestressed concrete box beam or girders - multiple carrying Pine RD over Drainage Ditch in Galveston County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 800 vehicles a day, projected to reach 800 by 2034. The structure is 75 ft (22.9 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesPine RD
CrossesDrainage Ditch
Location0.30 MI S of FM 1764
RouteCity Street 0
StateTexas
Coordinates29.39113, -94.96522
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length75 ft (22.9 m)
Longest span25 ft (7.6 m)
Deck width32 ft (9.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic800 (2014)
Projected traffic800 by 2034
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pine RD over Drainage Ditch built?

It was built in 2019, making it 6 years old in 2025.

What condition is Pine RD over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Pine RD over Drainage Ditch carry?

About 800 vehicles per day (2014 count).

How long is Pine RD over Drainage Ditch?

The structure is 75 ft (22.9 m) long with a longest span of 25 ft (7.6 m) and a deck 32 ft wide.

Who owns Pine RD over Drainage Ditch?

It is owned by the Town or Township Highway Agency.