US Bridges

SH 3 SB over Moses Bayou

Good

Galveston County, Texas · 1.5 MI NW of FM1764 · Structure no. 120850005103049

Built
1992
33 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
120 ft
3 main spans
Daily traffic
5,338
2023 count
Owner
State
State Highway Agency

About this bridge

SH 3 SB over Moses Bayou is a concrete stringer/multi-beam or girder carrying SH 3 SB over Moses Bayou in Galveston County, Texas. It was built in 1992, so it is 33 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,338 vehicles a day, roughly 2% of them trucks, projected to reach 9,609 by 2042. The structure is 120 ft (36.6 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSH 3 SB
CrossesMoses Bayou
Location1.5 MI NW of FM1764
RouteState Highway 3
StateTexas
Coordinates29.4131, -95.00202
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length120 ft (36.6 m)
Longest span40 ft (12.2 m)
Deck width43 ft (13.2 m)
Roadway width35 ft (10.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,338 (2023)
Projected traffic9,609 by 2042
Trucks2%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 3 SB over Moses Bayou built?

It was built in 1992, making it 33 years old in 2025.

What condition is SH 3 SB over Moses Bayou in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does SH 3 SB over Moses Bayou carry?

About 5,338 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is SH 3 SB over Moses Bayou?

The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 43 ft wide.

Who owns SH 3 SB over Moses Bayou?

It is owned by the State Highway Agency.