US Bridges

CR 2400(PECK Bush) over San Miguel Creek (south)

Good

Frio County, Texas · 0.45 MI N of CO RD 2500 · Structure no. 150830AA0217002

Built
2008
17 years old
Condition
Good
inspected July 2023
Type
Slab
Concrete Continuous
Length
55 ft
1 main span
Daily traffic
30
2013 count
Owner
County
County Highway Agency

About this bridge

CR 2400(PECK Bush) over San Miguel Creek (south) is a concrete continuous slab carrying CR 2400(PECK Bush) over San Miguel Creek (south) in Frio County, Texas. It was built in 2008, so it is 17 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30 vehicles a day, projected to reach 70 by 2033. The structure is 55 ft (16.8 m) long and 26 ft wide. If it were closed, the detour would be 21.7 mi (35 km).

CarriesCR 2400(PECK Bush)
CrossesSan Miguel Creek (south)
Location0.45 MI N of CO RD 2500
RouteCounty Highway 2400
StateTexas
Coordinates28.95588, -98.92656
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHL 93
Structure length55 ft (16.8 m)
Longest span25 ft (7.6 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2013)
Projected traffic70 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed21.7 mi (35 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 2400(PECK Bush) over San Miguel Creek (south) built?

It was built in 2008, making it 17 years old in 2025.

What condition is CR 2400(PECK Bush) over San Miguel Creek (south) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does CR 2400(PECK Bush) over San Miguel Creek (south) carry?

About 30 vehicles per day (2013 count).

How long is CR 2400(PECK Bush) over San Miguel Creek (south)?

The structure is 55 ft (16.8 m) long with a longest span of 25 ft (7.6 m) and a deck 26 ft wide.

Who owns CR 2400(PECK Bush) over San Miguel Creek (south)?

It is owned by the County Highway Agency.