CR 1301 over Hondo Creek Relief
GoodFrio County, Texas · 3.6 MI N of US 57 · Structure no. 150830AA0156001
- Built
- 1990
- 35 years old
- Condition
- Good
- inspected July 2023
- Type
- Slab
- Concrete
- Length
- 100 ft
- 4 main spans
- Daily traffic
- 30
- 2013 count
- Owner
- County
- County Highway Agency
About this bridge
CR 1301 over Hondo Creek Relief is a concrete slab carrying CR 1301 over Hondo Creek Relief in Frio County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 30 vehicles a day, projected to reach 50 by 2033. The structure is 100 ft (30.5 m) long and 26 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 1301 over Hondo Creek Relief built?
It was built in 1990, making it 35 years old in 2025.
What condition is CR 1301 over Hondo Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does CR 1301 over Hondo Creek Relief carry?
About 30 vehicles per day (2013 count).
How long is CR 1301 over Hondo Creek Relief?
The structure is 100 ft (30.5 m) long with a longest span of 25 ft (7.6 m) and a deck 26 ft wide.
Who owns CR 1301 over Hondo Creek Relief?
It is owned by the County Highway Agency.