IH 35 Sbml over IH 35 Bus Lp Conn
FairFrio County, Texas · 1.70 MI S of SH 85 · Structure no. 150830001707291
- Built
- 1973
- 52 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 174 ft
- 1 main span
- Daily traffic
- 12,769
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35 Sbml over IH 35 Bus Lp Conn is a prestressed concrete stringer/multi-beam or girder carrying IH 35 Sbml over IH 35 Bus Lp Conn in Frio County, Texas. It was built in 1973, so it is 52 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,769 vehicles a day, roughly 22% of them trucks, projected to reach 15,670 by 2033. The structure is 174 ft (53 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35 Sbml over IH 35 Bus Lp Conn built?
It was built in 1973, making it 52 years old in 2025.
What condition is IH 35 Sbml over IH 35 Bus Lp Conn in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does IH 35 Sbml over IH 35 Bus Lp Conn carry?
About 12,769 vehicles per day (2019 count), of which roughly 22% are trucks.
How long is IH 35 Sbml over IH 35 Bus Lp Conn?
The structure is 174 ft (53 m) long with a longest span of 90 ft (27.4 m) and a deck 44 ft wide.
Who owns IH 35 Sbml over IH 35 Bus Lp Conn?
It is owned by the State Highway Agency.