Camp Sienna Trail over Steep Bank Creek
GoodFort Bend County, Texas · 0.92 MI W of Scalan Trace · Structure no. 120800R00150289
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 200 ft
- 3 main spans
- Daily traffic
- 500
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Camp Sienna Trail over Steep Bank Creek is a prestressed concrete stringer/multi-beam or girder carrying Camp Sienna Trail over Steep Bank Creek in Fort Bend County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 500 vehicles a day, roughly 3% of them trucks, projected to reach 600 by 2040. The structure is 200 ft (61 m) long and 38 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Camp Sienna Trail over Steep Bank Creek built?
It was built in 2006, making it 19 years old in 2025.
What condition is Camp Sienna Trail over Steep Bank Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Camp Sienna Trail over Steep Bank Creek carry?
About 500 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is Camp Sienna Trail over Steep Bank Creek?
The structure is 200 ft (61 m) long with a longest span of 81 ft (24.7 m) and a deck 38 ft wide.
Who owns Camp Sienna Trail over Steep Bank Creek?
It is owned by the City or Municipal Highway Agency.