University Blvd SB over Drainage Ditch

Good

Fort Bend County, Texas · 0.6 MI South of SH 6 · Structure no. 120800H02014013

Built
2011
14 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
70 ft
1 main span
Daily traffic
8,000
2010 count
Owner
County
County Highway Agency

About this bridge

University Blvd SB over Drainage Ditch is a prestressed concrete stringer/multi-beam or girder carrying University Blvd SB over Drainage Ditch in Fort Bend County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,000 vehicles a day, roughly 1% of them trucks, projected to reach 26,000 by 2030. The structure is 70 ft (21.3 m) long and 51 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesUniversity Blvd SB
CrossesDrainage Ditch
Location0.6 MI South of SH 6
RouteCounty Highway 0
StateTexas
Coordinates29.60211, -95.64851
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length70 ft (21.3 m)
Longest span70 ft (21.3 m)
Deck width51 ft (15.5 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,000 (2010)
Projected traffic26,000 by 2030
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was University Blvd SB over Drainage Ditch built?

It was built in 2011, making it 14 years old in 2025.

What condition is University Blvd SB over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does University Blvd SB over Drainage Ditch carry?

About 8,000 vehicles per day (2010 count), of which roughly 1% are trucks.

How long is University Blvd SB over Drainage Ditch?

The structure is 70 ft (21.3 m) long with a longest span of 70 ft (21.3 m) and a deck 51 ft wide.

Who owns University Blvd SB over Drainage Ditch?

It is owned by the County Highway Agency.