University Blvd EB over Outfall Channel
GoodFort Bend County, Texas · 3.2 MI S of US 59/IH 69 · Structure no. 120800H02014005
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 635 ft
- 5 main spans
- Daily traffic
- 500
- 2013 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
University Blvd EB over Outfall Channel is a prestressed concrete stringer/multi-beam or girder carrying University Blvd EB over Outfall Channel in Fort Bend County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 500 vehicles a day, projected to reach 1,000 by 2035. The structure is 635 ft (193.5 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was University Blvd EB over Outfall Channel built?
It was built in 2013, making it 12 years old in 2025.
What condition is University Blvd EB over Outfall Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does University Blvd EB over Outfall Channel carry?
About 500 vehicles per day (2013 count).
How long is University Blvd EB over Outfall Channel?
The structure is 635 ft (193.5 m) long with a longest span of 125 ft (38.1 m) and a deck 48 ft wide.
Who owns University Blvd EB over Outfall Channel?
It is owned by the City or Municipal Highway Agency.