US Bridges

Imperial Blvd EB over Oyster Creek

Good

Fort Bend County, Texas · 0.24 MI E of SH6 · Structure no. 120800H00586001

Built
2013
12 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
216 ft
2 main spans
Daily traffic
500
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

Imperial Blvd EB over Oyster Creek is a prestressed concrete stringer/multi-beam or girder carrying Imperial Blvd EB over Oyster Creek in Fort Bend County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 500 vehicles a day, projected to reach 1,000 by 2035. The structure is 216 ft (65.8 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesImperial Blvd EB
CrossesOyster Creek
Location0.24 MI E of SH6
RouteCity Street 0
StateTexas
Coordinates29.62666, -95.64658
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2 (+1 approach)
Design loadHL 93
Structure length216 ft (65.8 m)
Longest span80 ft (24.4 m)
Deck width35 ft (10.7 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2013)
Projected traffic1,000 by 2035
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Imperial Blvd EB over Oyster Creek built?

It was built in 2013, making it 12 years old in 2025.

What condition is Imperial Blvd EB over Oyster Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Imperial Blvd EB over Oyster Creek carry?

About 500 vehicles per day (2013 count).

How long is Imperial Blvd EB over Oyster Creek?

The structure is 216 ft (65.8 m) long with a longest span of 80 ft (24.4 m) and a deck 35 ft wide.

Who owns Imperial Blvd EB over Oyster Creek?

It is owned by the City or Municipal Highway Agency.