Bryan RD EB over Dry Creek
GoodFort Bend County, Texas · 0.50 MI E of FM 2218 · Structure no. 120800C00155208
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 92 ft
- 1 main span
- Daily traffic
- 1,090
- 2010 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Bryan RD EB over Dry Creek is a prestressed concrete stringer/multi-beam or girder carrying Bryan RD EB over Dry Creek in Fort Bend County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,090 vehicles a day, projected to reach 1,090 by 2030. The structure is 92 ft (28 m) long and 32 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bryan RD EB over Dry Creek built?
It was built in 2019, making it 6 years old in 2025.
What condition is Bryan RD EB over Dry Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Bryan RD EB over Dry Creek carry?
About 1,090 vehicles per day (2010 count).
How long is Bryan RD EB over Dry Creek?
The structure is 92 ft (28 m) long with a longest span of 90 ft (27.4 m) and a deck 32 ft wide.
Who owns Bryan RD EB over Dry Creek?
It is owned by the Town or Township Highway Agency.