Clodine RD over Drainage Ditch
GoodFort Bend County, Texas · 0.3 MI S of W Belfort · Structure no. 120800AA9411002
- Built
- 1962
- 63 years old, rebuilt 2021
- Condition
- Good
- inspected September 2023
- Type
- Culvert
- Concrete
- Length
- 35 ft
- 4 main spans
- Daily traffic
- 5,000
- 2012 count
- Owner
- County
- County Highway Agency
About this bridge
Clodine RD over Drainage Ditch is a concrete culvert carrying Clodine RD over Drainage Ditch in Fort Bend County, Texas. It was built in 1962 and reconstructed in 2021, so it is 63 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,000 vehicles a day, roughly 5% of them trucks, projected to reach 7,500 by 2032. The structure is 35 ft (10.7 m) long. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Clodine RD over Drainage Ditch built?
It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2021.
What condition is Clodine RD over Drainage Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Clodine RD over Drainage Ditch carry?
About 5,000 vehicles per day (2012 count), of which roughly 5% are trucks.
How long is Clodine RD over Drainage Ditch?
The structure is 35 ft (10.7 m) long with a longest span of 7 ft (2.1 m).
Who owns Clodine RD over Drainage Ditch?
It is owned by the County Highway Agency.