W Aliana Trace DR over Oyster Creek
GoodFort Bend County, Texas · 0.85 MI S of W Airport · Structure no. 120800AA9242232
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 110 ft
- 1 main span
- Daily traffic
- 200
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
W Aliana Trace DR over Oyster Creek is a prestressed concrete stringer/multi-beam or girder carrying W Aliana Trace DR over Oyster Creek in Fort Bend County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 200 vehicles a day, roughly 1% of them trucks, projected to reach 500 by 2040. The structure is 110 ft (33.5 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W Aliana Trace DR over Oyster Creek built?
It was built in 2018, making it 7 years old in 2025.
What condition is W Aliana Trace DR over Oyster Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does W Aliana Trace DR over Oyster Creek carry?
About 200 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is W Aliana Trace DR over Oyster Creek?
The structure is 110 ft (33.5 m) long with a longest span of 60 ft (18.3 m) and a deck 58 ft wide.
Who owns W Aliana Trace DR over Oyster Creek?
It is owned by the County Highway Agency.