US Bridges

Pink-Taylor Run RD over Brooks Branch

Good

Fort Bend County, Texas · 0.40 MI NE of FM 2919 · Structure no. 120800AA0892001

Built
1999
26 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
40 ft
1 main span
Daily traffic
90
2010 count
Owner
County
County Highway Agency

About this bridge

Pink-Taylor Run RD over Brooks Branch is a steel stringer/multi-beam or girder carrying Pink-Taylor Run RD over Brooks Branch in Fort Bend County, Texas. It was built in 1999, so it is 26 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 90 vehicles a day, projected to reach 150 by 2030. The structure is 40 ft (12.2 m) long and 28 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesPink-Taylor Run RD
CrossesBrooks Branch
Location0.40 MI NE of FM 2919
RouteCounty Highway 0
StateTexas
Coordinates29.46528, -96.00617
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length40 ft (12.2 m)
Longest span40 ft (12.2 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic90 (2010)
Projected traffic150 by 2030
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pink-Taylor Run RD over Brooks Branch built?

It was built in 1999, making it 26 years old in 2025.

What condition is Pink-Taylor Run RD over Brooks Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Pink-Taylor Run RD over Brooks Branch carry?

About 90 vehicles per day (2010 count).

How long is Pink-Taylor Run RD over Brooks Branch?

The structure is 40 ft (12.2 m) long with a longest span of 40 ft (12.2 m) and a deck 28 ft wide.

Who owns Pink-Taylor Run RD over Brooks Branch?

It is owned by the County Highway Agency.