Marek RD over Guy Creek
FairPosted for loadFort Bend County, Texas · 0.35 MI SE of Vrlla RD · Structure no. 120800AA0764001
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 41 ft
- 3 main spans
- Daily traffic
- 304
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
Marek RD over Guy Creek is a wood or timber stringer/multi-beam or girder carrying Marek RD over Guy Creek in Fort Bend County, Texas. It was built in 1996, so it is 29 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 304 vehicles a day, projected to reach 400 by 2030. The structure is 41 ft (12.5 m) long and 23 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Marek RD over Guy Creek built?
It was built in 1996, making it 29 years old in 2025.
What condition is Marek RD over Guy Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Marek RD over Guy Creek carry?
About 304 vehicles per day (2010 count).
How long is Marek RD over Guy Creek?
The structure is 41 ft (12.5 m) long with a longest span of 14 ft (4.3 m) and a deck 23 ft wide.
Who owns Marek RD over Guy Creek?
It is owned by the County Highway Agency.