US Bridges

G Duty RD over Drainage Ditch

PoorPosted for load

Fort Bend County, Texas · 1.60 MI S of FM 1462 · Structure no. 120800AA0720003

Built
1991
34 years old
Condition
Poor
inspected October 2023
Type
Stringer/Multi-beam or Girder
Wood or Timber
Length
24 ft
2 main spans
Daily traffic
60
2009 count
Owner
County
County Highway Agency

About this bridge

G Duty RD over Drainage Ditch is a wood or timber stringer/multi-beam or girder carrying G Duty RD over Drainage Ditch in Fort Bend County, Texas. It was built in 1991, so it is 34 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.

It carries about 60 vehicles a day, projected to reach 150 by 2029. The structure is 24 ft (7.3 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesG Duty RD
CrossesDrainage Ditch
Location1.60 MI S of FM 1462
RouteCounty Highway 0
StateTexas
Coordinates29.31627, -95.68812
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating33 US tons
Inventory rating24 US tons

Structure

MaterialWood or Timber
DeckWood or timber
Main spans2
Design loadUnknown
Structure length24 ft (7.3 m)
Longest span11 ft (3.4 m)
Deck width28 ft (8.4 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2009)
Projected traffic150 by 2029
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was G Duty RD over Drainage Ditch built?

It was built in 1991, making it 34 years old in 2025.

What condition is G Duty RD over Drainage Ditch in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2023.

How much traffic does G Duty RD over Drainage Ditch carry?

About 60 vehicles per day (2009 count).

How long is G Duty RD over Drainage Ditch?

The structure is 24 ft (7.3 m) long with a longest span of 11 ft (3.4 m) and a deck 28 ft wide.

Who owns G Duty RD over Drainage Ditch?

It is owned by the County Highway Agency.