IH 69 NB Ml over Williams Way Blvd
GoodFort Bend County, Texas · 1.90 MI NE of FM 762 · Structure no. 120800002712568
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected September 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 365 ft
- 3 main spans
- Daily traffic
- 73,300
- 2011 count
- Owner
- State
- State Highway Agency
About this bridge
IH 69 NB Ml over Williams Way Blvd is a prestressed concrete stringer/multi-beam or girder carrying IH 69 NB Ml over Williams Way Blvd in Fort Bend County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 73,300 vehicles a day, roughly 5% of them trucks, projected to reach 107,400 by 2031. The structure is 365 ft (111.3 m) long and 104 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 69 NB Ml over Williams Way Blvd built?
It was built in 2018, making it 7 years old in 2025.
What condition is IH 69 NB Ml over Williams Way Blvd in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2022.
How much traffic does IH 69 NB Ml over Williams Way Blvd carry?
About 73,300 vehicles per day (2011 count), of which roughly 5% are trucks.
How long is IH 69 NB Ml over Williams Way Blvd?
The structure is 365 ft (111.3 m) long with a longest span of 125 ft (38.1 m) and a deck 104 ft wide.
Who owns IH 69 NB Ml over Williams Way Blvd?
It is owned by the State Highway Agency.