US Bridges

Holub RD over Middle Creek

Good

Fayette County, Texas · 1.60 MI E of US 77 · Structure no. 130760AA0307002

Built
2022
3 years old
Condition
Good
inspected March 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
90 ft
1 main span
Daily traffic
109
2017 count
Owner
County
County Highway Agency

About this bridge

Holub RD over Middle Creek is a prestressed concrete box beam or girders - multiple carrying Holub RD over Middle Creek in Fayette County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 109 vehicles a day, projected to reach 153 by 2041. The structure is 90 ft (27.4 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHolub RD
CrossesMiddle Creek
Location1.60 MI E of US 77
RouteCounty Highway 307
StateTexas
Coordinates29.70328, -96.87486
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length90 ft (27.4 m)
Longest span90 ft (27.4 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic109 (2017)
Projected traffic153 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Holub RD over Middle Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is Holub RD over Middle Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Holub RD over Middle Creek carry?

About 109 vehicles per day (2017 count).

How long is Holub RD over Middle Creek?

The structure is 90 ft (27.4 m) long with a longest span of 90 ft (27.4 m) and a deck 27 ft wide.

Who owns Holub RD over Middle Creek?

It is owned by the County Highway Agency.