US Bridges

FM 2762 over Pin Oak Creek

Good

Fayette County, Texas · 7.45 MI NW of IH 10 · Structure no. 130760282001003

Built
1964
61 years old, rebuilt 2020
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
32 ft
3 main spans
Daily traffic
100
2020 count
Owner
State
State Highway Agency

About this bridge

FM 2762 over Pin Oak Creek is a concrete culvert carrying FM 2762 over Pin Oak Creek in Fayette County, Texas. It was built in 1964 and reconstructed in 2020, so it is 61 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 11% of them trucks, projected to reach 120 by 2033. The structure is 32 ft (9.8 m) long and 43 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesFM 2762
CrossesPin Oak Creek
Location7.45 MI NW of IH 10
RouteState Highway 2762
StateTexas
Coordinates29.75448, -97.22816
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span10 ft (3 m)
Deck width43 ft (13 m)
Roadway width41 ft (12.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2020)
Projected traffic120 by 2033
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2762 over Pin Oak Creek built?

It was built in 1964, making it 61 years old in 2025. It was reconstructed in 2020.

What condition is FM 2762 over Pin Oak Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does FM 2762 over Pin Oak Creek carry?

About 100 vehicles per day (2020 count), of which roughly 11% are trucks.

How long is FM 2762 over Pin Oak Creek?

The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3 m) and a deck 43 ft wide.

Who owns FM 2762 over Pin Oak Creek?

It is owned by the State Highway Agency.