US Bridges

FM 2237 over Pin Oak Creek

Good

Fayette County, Texas · 0.85 MI SE of FM 154 · Structure no. 130760209601004

Built
1965
60 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
160 ft
5 main spans
Daily traffic
348
2020 count
Owner
State
State Highway Agency

About this bridge

FM 2237 over Pin Oak Creek is a concrete stringer/multi-beam or girder carrying FM 2237 over Pin Oak Creek in Fayette County, Texas. It was built in 1965, so it is 60 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 348 vehicles a day, roughly 9% of them trucks, projected to reach 530 by 2033. The structure is 160 ft (48.8 m) long and 28 ft wide. If it were closed, the detour would be 16.2 mi (26 km).

CarriesFM 2237
CrossesPin Oak Creek
Location0.85 MI SE of FM 154
RouteState Highway 2237
StateTexas
Coordinates29.80579, -97.06514
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58 US tons
Inventory rating34 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadH 15
Structure length160 ft (48.8 m)
Longest span32 ft (9.8 m)
Deck width28 ft (8.6 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic348 (2020)
Projected traffic530 by 2033
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed16.2 mi (26 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2237 over Pin Oak Creek built?

It was built in 1965, making it 60 years old in 2025.

What condition is FM 2237 over Pin Oak Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does FM 2237 over Pin Oak Creek carry?

About 348 vehicles per day (2020 count), of which roughly 9% are trucks.

How long is FM 2237 over Pin Oak Creek?

The structure is 160 ft (48.8 m) long with a longest span of 32 ft (9.8 m) and a deck 28 ft wide.

Who owns FM 2237 over Pin Oak Creek?

It is owned by the State Highway Agency.