US Bridges

FM 956 over Walker Branch

Good

Fayette County, Texas · 1.00 MI E of FM 2238 · Structure no. 130760126601001

Built
1951
74 years old
Condition
Good
inspected March 2023
Type
Culvert
Concrete
Length
32 ft
3 main spans
Daily traffic
231
2020 count
Owner
State
State Highway Agency

About this bridge

FM 956 over Walker Branch is a concrete culvert carrying FM 956 over Walker Branch in Fayette County, Texas. It was built in 1951, so it is 74 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 231 vehicles a day, roughly 9% of them trucks, projected to reach 190 by 2033. The structure is 32 ft (9.8 m) long and 21 ft wide. If it were closed, the detour would be 11.8 mi (19 km).

CarriesFM 956
CrossesWalker Branch
Location1.00 MI E of FM 2238
RouteState Highway 956
StateTexas
Coordinates29.75835, -96.95117
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadOther
Structure length32 ft (9.8 m)
Longest span10 ft (3 m)
Deck width21 ft (6.5 m)
Roadway width19 ft (5.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic231 (2020)
Projected traffic190 by 2033
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.8 mi (19 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$1,000
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 956 over Walker Branch built?

It was built in 1951, making it 74 years old in 2025.

What condition is FM 956 over Walker Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does FM 956 over Walker Branch carry?

About 231 vehicles per day (2020 count), of which roughly 9% are trucks.

How long is FM 956 over Walker Branch?

The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3 m) and a deck 21 ft wide.

Who owns FM 956 over Walker Branch?

It is owned by the State Highway Agency.