US Bridges

CR 360 over Salt Creek

Good

Falls County, Texas · 0.14 MI SE of US 77 · Structure no. 090740AA0360001

Built
2022
3 years old
Condition
Good
inspected March 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
65 ft
1 main span
Daily traffic
220
2017 count
Owner
County
County Highway Agency

About this bridge

CR 360 over Salt Creek is a prestressed concrete box beam or girders - multiple carrying CR 360 over Salt Creek in Falls County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 220 vehicles a day, projected to reach 300 by 2037. The structure is 65 ft (19.8 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCR 360
CrossesSalt Creek
Location0.14 MI SE of US 77
RouteCounty Highway 360
StateTexas
Coordinates31.08011, -96.97951
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length65 ft (19.8 m)
Longest span65 ft (19.8 m)
Deck width26 ft (8 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic220 (2017)
Projected traffic300 by 2037
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 360 over Salt Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is CR 360 over Salt Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does CR 360 over Salt Creek carry?

About 220 vehicles per day (2017 count).

How long is CR 360 over Salt Creek?

The structure is 65 ft (19.8 m) long with a longest span of 65 ft (19.8 m) and a deck 26 ft wide.

Who owns CR 360 over Salt Creek?

It is owned by the County Highway Agency.