CR 351 - Pct 2 over Bell Branch
FairPosted for loadErath County, Texas · 0.6 MI N of US 377 · Structure no. 020730AA0351001
- Built
- 1921
- 104 years old
- Condition
- Fair
- inspected June 2024
- Type
- Slab
- Concrete Continuous
- Length
- 44 ft
- 4 main spans
- Daily traffic
- 299
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
CR 351 - Pct 2 over Bell Branch is a concrete continuous slab carrying CR 351 - Pct 2 over Bell Branch in Erath County, Texas. It was built in 1921, so it is 104 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 299 vehicles a day, projected to reach 370 by 2036. The structure is 44 ft (13.4 m) long and 21 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 351 - Pct 2 over Bell Branch built?
It was built in 1921, making it 104 years old in 2025.
What condition is CR 351 - Pct 2 over Bell Branch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does CR 351 - Pct 2 over Bell Branch carry?
About 299 vehicles per day (2024 count).
How long is CR 351 - Pct 2 over Bell Branch?
The structure is 44 ft (13.4 m) long with a longest span of 11 ft (3.4 m) and a deck 21 ft wide.
Who owns CR 351 - Pct 2 over Bell Branch?
It is owned by the County Highway Agency.