CR 293 - Pct 1 over Gilmore Creek
GoodErath County, Texas · 0.47 MI E of FM 914 · Structure no. 020730AA0293001
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 65 ft
- 1 main span
- Daily traffic
- 21
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
CR 293 - Pct 1 over Gilmore Creek is a prestressed concrete stringer/multi-beam or girder carrying CR 293 - Pct 1 over Gilmore Creek in Erath County, Texas. It was built in 2004, so it is 21 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 21 vehicles a day, roughly 3% of them trucks, projected to reach 128 by 2042. The structure is 65 ft (19.8 m) long and 26 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 293 - Pct 1 over Gilmore Creek built?
It was built in 2004, making it 21 years old in 2025.
What condition is CR 293 - Pct 1 over Gilmore Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does CR 293 - Pct 1 over Gilmore Creek carry?
About 21 vehicles per day (2019 count), of which roughly 3% are trucks.
How long is CR 293 - Pct 1 over Gilmore Creek?
The structure is 65 ft (19.8 m) long with a longest span of 64 ft (19.5 m) and a deck 26 ft wide.
Who owns CR 293 - Pct 1 over Gilmore Creek?
It is owned by the County Highway Agency.