CR 128 - Pct 4 over Lost Creek
FairPosted for loadErath County, Texas · 1.15 MI SE of FM 1188 · Structure no. 020730AA0128001
- Built
- 1933
- 92 years old, rebuilt 2016
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 37 ft
- 1 main span
- Daily traffic
- 41
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
CR 128 - Pct 4 over Lost Creek is a steel stringer/multi-beam or girder carrying CR 128 - Pct 4 over Lost Creek in Erath County, Texas. It was built in 1933 and reconstructed in 2016, so it is 92 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 41 vehicles a day, roughly 3% of them trucks, projected to reach 128 by 2042. The structure is 37 ft (11.3 m) long and 20 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 128 - Pct 4 over Lost Creek built?
It was built in 1933, making it 92 years old in 2025. It was reconstructed in 2016.
What condition is CR 128 - Pct 4 over Lost Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does CR 128 - Pct 4 over Lost Creek carry?
About 41 vehicles per day (2019 count), of which roughly 3% are trucks.
How long is CR 128 - Pct 4 over Lost Creek?
The structure is 37 ft (11.3 m) long with a longest span of 36 ft (11 m) and a deck 20 ft wide.
Who owns CR 128 - Pct 4 over Lost Creek?
It is owned by the County Highway Agency.