US Bridges

Upland ST over Juan De Herrera Lat a

Good

El Paso County, Texas · 0.15 MI N of FM 76 · Structure no. 240720B69240001

Built
1990
35 years old
Condition
Good
inspected April 2024
Type
Slab
Concrete
Length
25 ft
1 main span
Daily traffic
62
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Upland ST over Juan De Herrera Lat a is a concrete slab carrying Upland ST over Juan De Herrera Lat a in El Paso County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 62 vehicles a day, roughly 3% of them trucks, projected to reach 87 by 2040. The structure is 25 ft (7.6 m) long and 30 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesUpland ST
CrossesJuan De Herrera Lat a
Location0.15 MI N of FM 76
RouteCity Street 0
StateTexas
Coordinates31.72313, -106.33304
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadOther
Structure length25 ft (7.6 m)
Longest span25 ft (7.6 m)
Deck width30 ft (9.1 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic62 (2017)
Projected traffic87 by 2040
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Upland ST over Juan De Herrera Lat a built?

It was built in 1990, making it 35 years old in 2025.

What condition is Upland ST over Juan De Herrera Lat a in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Upland ST over Juan De Herrera Lat a carry?

About 62 vehicles per day (2017 count), of which roughly 3% are trucks.

How long is Upland ST over Juan De Herrera Lat a?

The structure is 25 ft (7.6 m) long with a longest span of 25 ft (7.6 m) and a deck 30 ft wide.

Who owns Upland ST over Juan De Herrera Lat a?

It is owned by the City or Municipal Highway Agency.