US Bridges

Titanic Ave over Diana Ditch

Fair

El Paso County, Texas · 0.12 MI S of Hercules Ave · Structure no. 240720B67720001

Built
1989
36 years old
Condition
Fair
inspected April 2024
Type
Culvert
Concrete
Length
55 ft
5 main spans
Daily traffic
2,050
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Titanic Ave over Diana Ditch is a concrete culvert carrying Titanic Ave over Diana Ditch in El Paso County, Texas. It was built in 1989, so it is 36 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,050 vehicles a day, roughly 3% of them trucks, projected to reach 2,500 by 2037. The structure is 55 ft (16.8 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesTitanic Ave
CrossesDiana Ditch
Location0.12 MI S of Hercules Ave
RouteCity Street 0
StateTexas
Coordinates31.85363, -106.4228
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length55 ft (16.8 m)
Longest span10 ft (3 m)
Deck width60 ft (18.3 m)
Roadway width36 ft (11.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,050 (2017)
Projected traffic2,500 by 2037
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Titanic Ave over Diana Ditch built?

It was built in 1989, making it 36 years old in 2025.

What condition is Titanic Ave over Diana Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Titanic Ave over Diana Ditch carry?

About 2,050 vehicles per day (2017 count), of which roughly 3% are trucks.

How long is Titanic Ave over Diana Ditch?

The structure is 55 ft (16.8 m) long with a longest span of 10 ft (3 m) and a deck 60 ft wide.

Who owns Titanic Ave over Diana Ditch?

It is owned by the City or Municipal Highway Agency.