US Bridges

Resler DR SB over Drainage Channel

Good

El Paso County, Texas · 1.22 MI S of Lp 375 · Structure no. 240720B56290014

Built
2003
22 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
88 ft
1 main span
Daily traffic
9,400
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Resler DR SB over Drainage Channel is a prestressed concrete stringer/multi-beam or girder carrying Resler DR SB over Drainage Channel in El Paso County, Texas. It was built in 2003, so it is 22 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,400 vehicles a day, roughly 20% of them trucks, projected to reach 28,170 by 2037. The structure is 88 ft (26.8 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesResler DR SB
CrossesDrainage Channel
Location1.22 MI S of Lp 375
RouteCity Street 0
StateTexas
Coordinates31.8924, -106.57382
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length88 ft (26.8 m)
Longest span88 ft (26.8 m)
Deck width48 ft (14.6 m)
Roadway width39 ft (11.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,400 (2017)
Projected traffic28,170 by 2037
Trucks20%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$9,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Resler DR SB over Drainage Channel built?

It was built in 2003, making it 22 years old in 2025.

What condition is Resler DR SB over Drainage Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Resler DR SB over Drainage Channel carry?

About 9,400 vehicles per day (2017 count), of which roughly 20% are trucks.

How long is Resler DR SB over Drainage Channel?

The structure is 88 ft (26.8 m) long with a longest span of 88 ft (26.8 m) and a deck 48 ft wide.

Who owns Resler DR SB over Drainage Channel?

It is owned by the City or Municipal Highway Agency.