US Bridges

N Resler DR over Arroyo

Good

El Paso County, Texas · 2.50 MI N of Mesa RD · Structure no. 240720B56290004

Built
1996
29 years old
Condition
Good
inspected May 2024
Type
Other
Prestressed Concrete
Length
60 ft
1 main span
Daily traffic
5,000
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

N Resler DR over Arroyo is a prestressed concrete other carrying N Resler DR over Arroyo in El Paso County, Texas. It was built in 1996, so it is 29 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,000 vehicles a day, roughly 3% of them trucks, projected to reach 10,000 by 2037. The structure is 60 ft (18.3 m) long and 121 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesN Resler DR
CrossesArroyo
Location2.50 MI N of Mesa RD
RouteCity Street 0
StateTexas
Coordinates31.86901, -106.55741
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeOther
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length60 ft (18.3 m)
Longest span58 ft (17.7 m)
Deck width121 ft (37 m)
Roadway width98 ft (29.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2017)
Projected traffic10,000 by 2037
Trucks3%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was N Resler DR over Arroyo built?

It was built in 1996, making it 29 years old in 2025.

What condition is N Resler DR over Arroyo in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does N Resler DR over Arroyo carry?

About 5,000 vehicles per day (2017 count), of which roughly 3% are trucks.

How long is N Resler DR over Arroyo?

The structure is 60 ft (18.3 m) long with a longest span of 58 ft (17.7 m) and a deck 121 ft wide.

Who owns N Resler DR over Arroyo?

It is owned by the City or Municipal Highway Agency.