Railroad DR over Drainage Ditch
FairPosted for loadEl Paso County, Texas · 0.60 MI SW of Diana DR · Structure no. 240720B55000013
- Built
- 1960
- 65 years old, rebuilt 1986
- Condition
- Fair
- inspected April 2024
- Type
- Other
- Prestressed Concrete
- Length
- 31 ft
- 1 main span
- Daily traffic
- 25,700
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Railroad DR over Drainage Ditch is a prestressed concrete other carrying Railroad DR over Drainage Ditch in El Paso County, Texas. It was built in 1960 and reconstructed in 1986, so it is 65 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 25,700 vehicles a day, projected to reach 35,000 by 2037. The structure is 31 ft (9.4 m) long and 111 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Railroad DR over Drainage Ditch built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1986.
What condition is Railroad DR over Drainage Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Railroad DR over Drainage Ditch carry?
About 25,700 vehicles per day (2017 count).
How long is Railroad DR over Drainage Ditch?
The structure is 31 ft (9.4 m) long with a longest span of 30 ft (9.1 m) and a deck 111 ft wide.
Who owns Railroad DR over Drainage Ditch?
It is owned by the City or Municipal Highway Agency.