US Bridges

Padres DR SB over Playa Drain

Fair

El Paso County, Texas · 0.15 MI SW of SH 20 · Structure no. 240720B50565014

Built
1976
49 years old
Condition
Fair
inspected May 2024
Type
Other
Prestressed Concrete
Length
62 ft
1 main span
Daily traffic
4,719
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Padres DR SB over Playa Drain is a prestressed concrete other carrying Padres DR SB over Playa Drain in El Paso County, Texas. It was built in 1976, so it is 49 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,719 vehicles a day, projected to reach 6,130 by 2030. The structure is 62 ft (18.9 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPadres DR SB
CrossesPlaya Drain
Location0.15 MI SW of SH 20
RouteCity Street 37
StateTexas
Coordinates31.69307, -106.33687
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeOther
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length62 ft (18.9 m)
Longest span62 ft (18.9 m)
Deck width48 ft (14.6 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,719 (2022)
Projected traffic6,130 by 2030
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Padres DR SB over Playa Drain built?

It was built in 1976, making it 49 years old in 2025.

What condition is Padres DR SB over Playa Drain in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does Padres DR SB over Playa Drain carry?

About 4,719 vehicles per day (2022 count).

How long is Padres DR SB over Playa Drain?

The structure is 62 ft (18.9 m) long with a longest span of 62 ft (18.9 m) and a deck 48 ft wide.

Who owns Padres DR SB over Playa Drain?

It is owned by the City or Municipal Highway Agency.