US Bridges

Paseo Del Este Blv over Draw

Fair

El Paso County, Texas · 2.0 MI E of SH 375 · Structure no. 240720AA1452002

Built
2023
2 years old
Condition
Fair
inspected April 2024
Type
Culvert
Concrete
Length
42 ft
4 main spans
Daily traffic
250
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Paseo Del Este Blv over Draw is a concrete culvert carrying Paseo Del Este Blv over Draw in El Paso County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 250 vehicles a day, roughly 5% of them trucks, projected to reach 1 by 1900. The structure is 42 ft (12.7 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPaseo Del Este Blv
CrossesDraw
Location2.0 MI E of SH 375
RouteCity Street 0
StateTexas
Coordinates31.70247, -106.25967
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4 (+4 approach)
Design loadUnknown
Structure length42 ft (12.7 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic250 (2024)
Projected traffic1 by 1900
Trucks5%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Paseo Del Este Blv over Draw built?

It was built in 2023, making it 2 years old in 2025.

What condition is Paseo Del Este Blv over Draw in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Paseo Del Este Blv over Draw carry?

About 250 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Paseo Del Este Blv over Draw?

The structure is 42 ft (12.7 m) long with a longest span of 10 ft (3 m).

Who owns Paseo Del Este Blv over Draw?

It is owned by the City or Municipal Highway Agency.