Sl 375 over UP RR BNSF RR US 85
GoodEl Paso County, Texas · 0.17 MI SE of Spur 1966 · Structure no. 240720255204327
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 6,263 ft
- 45 main spans
- Daily traffic
- 7,100
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Sl 375 over UP RR BNSF RR US 85 is a prestressed concrete stringer/multi-beam or girder carrying Sl 375 over UP RR BNSF RR US 85 in El Paso County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,100 vehicles a day, roughly 10% of them trucks, projected to reach 16,900 by 2035. The structure is 6,263 ft (1,909 m) long and 84 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sl 375 over UP RR BNSF RR US 85 built?
It was built in 2018, making it 7 years old in 2025.
What condition is Sl 375 over UP RR BNSF RR US 85 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Sl 375 over UP RR BNSF RR US 85 carry?
About 7,100 vehicles per day (2015 count), of which roughly 10% are trucks.
How long is Sl 375 over UP RR BNSF RR US 85?
The structure is 6,263 ft (1,909 m) long with a longest span of 145 ft (44.2 m) and a deck 84 ft wide.
Who owns Sl 375 over UP RR BNSF RR US 85?
It is owned by the State Highway Agency.