US Bridges

Sl 375 over Water # 6 & Future DR

Good

El Paso County, Texas · 0.18 MI SE of US 85 · Structure no. 240720255204311

Built
2018
7 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
372 ft
2 main spans
Daily traffic
29,182
2022 count
Owner
State
State Highway Agency

About this bridge

Sl 375 over Water # 6 & Future DR is a prestressed concrete stringer/multi-beam or girder carrying Sl 375 over Water # 6 & Future DR in El Paso County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 29,182 vehicles a day, roughly 6% of them trucks, projected to reach 40,855 by 2035. The structure is 372 ft (113.4 m) long and 94 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSl 375
CrossesWater # 6 & Future DR
Location0.18 MI SE of US 85
RouteState Highway 375
StateTexas
Coordinates31.80176, -106.53647
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2 (+1 approach)
Design loadHL 93
Structure length372 ft (113.4 m)
Longest span138 ft (42.1 m)
Deck width94 ft (28.7 m)
Roadway width89 ft (27.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29,182 (2022)
Projected traffic40,855 by 2035
Trucks6%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sl 375 over Water # 6 & Future DR built?

It was built in 2018, making it 7 years old in 2025.

What condition is Sl 375 over Water # 6 & Future DR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Sl 375 over Water # 6 & Future DR carry?

About 29,182 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is Sl 375 over Water # 6 & Future DR?

The structure is 372 ft (113.4 m) long with a longest span of 138 ft (42.1 m) and a deck 94 ft wide.

Who owns Sl 375 over Water # 6 & Future DR?

It is owned by the State Highway Agency.