US Bridges

WBSL375 to WBUS62 over EB US62/UPRR/COLES ST

Good

El Paso County, Texas · 1.244 Mi. West of US 54 · Structure no. 240720255204305

Built
2018
7 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,401 ft
9 main spans
Daily traffic
6,300
2021 count
Owner
State
State Highway Agency

About this bridge

WBSL375 to WBUS62 over EB US62/UPRR/COLES ST is a prestressed concrete stringer/multi-beam or girder carrying WBSL375 to WBUS62 over EB US62/UPRR/COLES ST in El Paso County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,300 vehicles a day, roughly 32% of them trucks, projected to reach 9,450 by 2041. The structure is 1,401 ft (427 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesWBSL375 to WBUS62
CrossesEB US62/UPRR/COLES ST
Location1.244 Mi. West of US 54
RouteState Highway 375
StateTexas
Coordinates31.76059, -106.46809
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans9 (+1 approach)
Design loadHL 93
Structure length1,401 ft (427 m)
Longest span156 ft (47.5 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,300 (2021)
Projected traffic9,450 by 2041
Trucks32%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was WBSL375 to WBUS62 over EB US62/UPRR/COLES ST built?

It was built in 2018, making it 7 years old in 2025.

What condition is WBSL375 to WBUS62 over EB US62/UPRR/COLES ST in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does WBSL375 to WBUS62 over EB US62/UPRR/COLES ST carry?

About 6,300 vehicles per day (2021 count), of which roughly 32% are trucks.

How long is WBSL375 to WBUS62 over EB US62/UPRR/COLES ST?

The structure is 1,401 ft (427 m) long with a longest span of 156 ft (47.5 m) and a deck 28 ft wide.

Who owns WBSL375 to WBUS62 over EB US62/UPRR/COLES ST?

It is owned by the State Highway Agency.