US Bridges

SL375SB Off Ramp H over Sl 375SB on Ramp J

Good

El Paso County, Texas · .27 Mi. SW of FM 76 · Structure no. 240720255203334

Built
2022
3 years old
Condition
Good
inspected March 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,276 ft
10 main spans
Daily traffic
14,600
2020 count
Owner
State
State Highway Agency

About this bridge

SL375SB Off Ramp H over Sl 375SB on Ramp J is a prestressed concrete stringer/multi-beam or girder carrying SL375SB Off Ramp H over Sl 375SB on Ramp J in El Paso County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,600 vehicles a day, roughly 4% of them trucks, projected to reach 21,800 by 2040. The structure is 1,276 ft (388.9 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSL375SB Off Ramp H
CrossesSl 375SB on Ramp J
Location.27 Mi. SW of FM 76
RouteState Highway 375
StateTexas
Coordinates31.68536, -106.30212
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans10
Design loadHL 93
Structure length1,276 ft (388.9 m)
Longest span128 ft (39 m)
Deck width38 ft (11.6 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,600 (2020)
Projected traffic21,800 by 2040
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SL375SB Off Ramp H over Sl 375SB on Ramp J built?

It was built in 2022, making it 3 years old in 2025.

What condition is SL375SB Off Ramp H over Sl 375SB on Ramp J in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.

How much traffic does SL375SB Off Ramp H over Sl 375SB on Ramp J carry?

About 14,600 vehicles per day (2020 count), of which roughly 4% are trucks.

How long is SL375SB Off Ramp H over Sl 375SB on Ramp J?

The structure is 1,276 ft (388.9 m) long with a longest span of 128 ft (39 m) and a deck 38 ft wide.

Who owns SL375SB Off Ramp H over Sl 375SB on Ramp J?

It is owned by the State Highway Agency.