US Bridges

Sl 375 over Pebble Hills Blvd

Fair

El Paso County, Texas · 2.1 MI S of US 62 · Structure no. 240720255203274

Built
2006
19 years old
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
259 ft
1 main span
Daily traffic
77,692
2022 count
Owner
State
State Highway Agency

About this bridge

Sl 375 over Pebble Hills Blvd is a prestressed concrete stringer/multi-beam or girder carrying Sl 375 over Pebble Hills Blvd in El Paso County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 77,692 vehicles a day, roughly 7% of them trucks, projected to reach 108,769 by 2042. The structure is 259 ft (78.9 m) long and 119 ft wide.

CarriesSl 375
CrossesPebble Hills Blvd
Location2.1 MI S of US 62
RouteState Highway 375
StateTexas
Coordinates31.77643, -106.26795
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 25 or greater
Structure length259 ft (78.9 m)
Longest span119 ft (36.3 m)
Deck width119 ft (36.3 m)
Roadway width114 ft (34.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic77,692 (2022)
Projected traffic108,769 by 2042
Trucks7%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sl 375 over Pebble Hills Blvd built?

It was built in 2006, making it 19 years old in 2025.

What condition is Sl 375 over Pebble Hills Blvd in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does Sl 375 over Pebble Hills Blvd carry?

About 77,692 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is Sl 375 over Pebble Hills Blvd?

The structure is 259 ft (78.9 m) long with a longest span of 119 ft (36.3 m) and a deck 119 ft wide.

Who owns Sl 375 over Pebble Hills Blvd?

It is owned by the State Highway Agency.