US Bridges

Loop 375 EB over Pan American DR

Good

El Paso County, Texas · Loop 375 at Pan American · Structure no. 240720255203092

Built
2000
25 years old, rebuilt 2024
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
274 ft
1 main span
Daily traffic
14,982
2019 count
Owner
State
State Highway Agency

About this bridge

Loop 375 EB over Pan American DR is a prestressed concrete stringer/multi-beam or girder carrying Loop 375 EB over Pan American DR in El Paso County, Texas. It was built in 2000 and reconstructed in 2024, so it is 25 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,982 vehicles a day, roughly 4% of them trucks, projected to reach 18,410 by 2033. The structure is 274 ft (83.5 m) long and 59 ft wide.

CarriesLoop 375 EB
CrossesPan American DR
LocationLoop 375 at Pan American
RouteState Highway 375
StateTexas
Coordinates31.6761, -106.32343
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 25 or greater
Structure length274 ft (83.5 m)
Longest span110 ft (33.5 m)
Deck width59 ft (18.1 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,982 (2019)
Projected traffic18,410 by 2033
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Loop 375 EB over Pan American DR built?

It was built in 2000, making it 25 years old in 2025. It was reconstructed in 2024.

What condition is Loop 375 EB over Pan American DR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Loop 375 EB over Pan American DR carry?

About 14,982 vehicles per day (2019 count), of which roughly 4% are trucks.

How long is Loop 375 EB over Pan American DR?

The structure is 274 ft (83.5 m) long with a longest span of 110 ft (33.5 m) and a deck 59 ft wide.

Who owns Loop 375 EB over Pan American DR?

It is owned by the State Highway Agency.