US Bridges

Pellicano DR WB over Lp 375

Good

El Paso County, Texas · 2.00 MI NE of IH 10 · Structure no. 240720255203051

Built
2005
20 years old
Condition
Good
inspected March 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
190 ft
2 main spans
Daily traffic
2,000
2018 count
Owner
State
State Highway Agency

About this bridge

Pellicano DR WB over Lp 375 is a prestressed concrete stringer/multi-beam or girder carrying Pellicano DR WB over Lp 375 in El Paso County, Texas. It was built in 2005, so it is 20 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,000 vehicles a day, roughly 1% of them trucks, projected to reach 3,000 by 2038. The structure is 190 ft (57.9 m) long and 101 ft wide.

CarriesPellicano DR WB
CrossesLp 375
Location2.00 MI NE of IH 10
RouteCity Street 0
StateTexas
Coordinates31.72646, -106.26705
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 25 or greater
Structure length190 ft (57.9 m)
Longest span95 ft (29 m)
Deck width101 ft (30.9 m)
Roadway width50 ft (15.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,000 (2018)
Projected traffic3,000 by 2038
Trucks1%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pellicano DR WB over Lp 375 built?

It was built in 2005, making it 20 years old in 2025.

What condition is Pellicano DR WB over Lp 375 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.

How much traffic does Pellicano DR WB over Lp 375 carry?

About 2,000 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is Pellicano DR WB over Lp 375?

The structure is 190 ft (57.9 m) long with a longest span of 95 ft (29 m) and a deck 101 ft wide.

Who owns Pellicano DR WB over Lp 375?

It is owned by the State Highway Agency.