US Bridges

Lp 375 EB over Northwestern DR

Good

El Paso County, Texas · 0.41 MI E of IH 10 · Structure no. 240720255201286

Built
2014
11 years old
Condition
Good
inspected March 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
233 ft
2 main spans
Daily traffic
15,785
2020 count
Owner
State
State Highway Agency

About this bridge

Lp 375 EB over Northwestern DR is a prestressed concrete stringer/multi-beam or girder carrying Lp 375 EB over Northwestern DR in El Paso County, Texas. It was built in 2014, so it is 11 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,785 vehicles a day, roughly 5% of them trucks, projected to reach 20,836 by 2040. The structure is 233 ft (71 m) long and 70 ft wide.

CarriesLp 375 EB
CrossesNorthwestern DR
Location0.41 MI E of IH 10
RouteState Highway 375
StateTexas
Coordinates31.90811, -106.57594
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2 (+1 approach)
Design loadHL 93
Structure length233 ft (71 m)
Longest span97 ft (29.6 m)
Deck width70 ft (21.2 m)
Roadway width67 ft (20.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,785 (2020)
Projected traffic20,836 by 2040
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Lp 375 EB over Northwestern DR built?

It was built in 2014, making it 11 years old in 2025.

What condition is Lp 375 EB over Northwestern DR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.

How much traffic does Lp 375 EB over Northwestern DR carry?

About 15,785 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is Lp 375 EB over Northwestern DR?

The structure is 233 ft (71 m) long with a longest span of 97 ft (29.6 m) and a deck 70 ft wide.

Who owns Lp 375 EB over Northwestern DR?

It is owned by the State Highway Agency.