US Bridges

SL375 SB to IH10EB over IH 10 & Sl 375

Good

El Paso County, Texas · IH 10 at Sl 375 · Structure no. 240720212104305

Built
2016
9 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
1,838 ft
4 main spans
Daily traffic
9,481
2023 count
Owner
State
State Highway Agency

About this bridge

SL375 SB to IH10EB over IH 10 & Sl 375 is a steel continuous stringer/multi-beam or girder carrying SL375 SB to IH10EB over IH 10 & Sl 375 in El Paso County, Texas. It was built in 2016, so it is 9 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,481 vehicles a day, roughly 10% of them trucks, projected to reach 9,700 by 2033. The structure is 1,838 ft (560.2 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSL375 SB to IH10EB
CrossesIH 10 & Sl 375
LocationIH 10 at Sl 375
RouteState Highway 375
StateTexas
Coordinates31.70376, -106.28273
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4 (+7 approach)
Design loadHL 93
Structure length1,838 ft (560.2 m)
Longest span275 ft (83.8 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deck17 ft (5.1 m)

Traffic and service

Average daily traffic9,481 (2023)
Projected traffic9,700 by 2033
Trucks10%
Lanes on structure1
Traffic directionOne-way traffic
CarriesThird level (interchange)
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SL375 SB to IH10EB over IH 10 & Sl 375 built?

It was built in 2016, making it 9 years old in 2025.

What condition is SL375 SB to IH10EB over IH 10 & Sl 375 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does SL375 SB to IH10EB over IH 10 & Sl 375 carry?

About 9,481 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is SL375 SB to IH10EB over IH 10 & Sl 375?

The structure is 1,838 ft (560.2 m) long with a longest span of 275 ft (83.8 m) and a deck 28 ft wide.

Who owns SL375 SB to IH10EB over IH 10 & Sl 375?

It is owned by the State Highway Agency.